EnterWorks

Welcome to the EnterWorks™ Software community!  Please feel free to start a discussion in the discussion tab or join in a conversation.

Here are some useful links where you can find more information:

Product Documentation  Ideas Portal

Discussions

Members

Resources

Events

 View Only

EnterWorks Tech Talk: "ETT 185 - Creating a Minimal Saved Set for Scheduled Promotion of Valid Records" Published on Precisely University

  • 1.  EnterWorks Tech Talk: "ETT 185 - Creating a Minimal Saved Set for Scheduled Promotion of Valid Records" Published on Precisely University

    Employee
    Posted 01-22-2026 21:04

    The EnterWorks Scheduled Promotion lacks detailed options for promoting only the specific records that need to be promoted. This can lead to longer promotion jobs, which may cause issues when multiple repositories are promoted frequently.

    Assuming the records to be promoted have already been validated, a stored procedure invoked from a Scheduled Export can define a saved set containing only the records that need to be promoted. Instead of scheduling or launching the Promotion job separately, this Scheduled Export would be executed first, and it would then trigger the Promotion job, which would be configured to promote only the records in the saved set. If the saved set is empty, launching the Promotion job can be skipped.

    This session explains the stored procedure and how to configure it in Scheduled jobs.

    Link: ETT 185 - Creating a Minimal Saved Set for Scheduled Promotion of Valid Records



    ------------------------------
    Brian Zupke
    *Precisely Software Inc.
    ------------------------------