Note: This was originally posted by an inactive account. Content was preserved by moving under an admin account.
Originally posted by: Carl_MorrisHello,
I am wondering if it is possible for different graphs to use the same BRX at the same time?
We have a large, central graph that is used to load different files, depending which node is selected and run. This allows a central graph to re-use the same parameters over different nodes.
Separate to this, I have created individual graphs that will load files (using the same method as the central graph) and have scheduled this using the automation tool.
This works fine, but it means that we have two different graphs that do the same thing, so we run the risk of team members using/updating the incorrect graph.
So my question is, can I call a BRX from different parent graphs and only run certain nodes depending a parameter value (using the 'Enabled' option under 'Logistics') and can multiple parent graphs use the BRX at the same time?
I hope that makes sense, let me know if anything is unclear.
Thanks,
Carl